Practical tips for system plant design that could save your day
If the customer requires changes to your plant design shortly before the project is completed, then a forward-looking 3D design created with a flexible and dynamic CAD system can save the day.
Customers often change their requirements
Tackling Unexpected Changes
4 x Quicker in 3D
Making unexpected last-minute changes
Fast Feasibility, High Quality
M4 PLANT’s 3D visualisation delivers rapid proof-of-concept and effective change communication. “A customer recently wanted to change their oil well tree type, which entails surface pipework modifications. With MPDS4*, it took 2-3 days to prove feasibility and complete the design change. In 2D it would have taken 2-3 weeks.” Martin explains, “And with automatic interference checking we can avoid any mistakes caused by the rush to make last-minute changes, minimising the risk of ugly surprises on-site.”
Not everyone is a Last-minute Larry, but often plant project requirements and priorities shift late in the day, no matter how careful the initial scoping. Being armed with flexible 3D engineering design software, and a matching flexible attitude, enables WSP CEL to save huge costs and build customer loyalty.
Being armed with M4 PLANT, a flexible 3D engineering design software, and a matching flexible attitude, WSP CEL saves huge costs and build customer loyalty.